打造能源电力高质量发展“湾区样本”
Zhong Guo Dian Li Bao·2026-01-21 07:49

Core Insights - The Guangdong-Hong Kong-Macao Greater Bay Area (GBA) is projected to achieve an economic total of 14.79 trillion RMB in 2024, surpassing major global bay areas like New York and San Francisco, and ranking alongside Tokyo Bay as a leader in the global first tier [1] - The GBA is focusing on high-quality development in energy and electricity, aiming to lead the transition towards greener energy solutions [1] Energy and Electricity Development Achievements - The GBA's electricity consumption is expected to reach 696.2 billion kWh in 2024, marking an increase of 76.1 billion kWh from 2020, with an average annual growth rate of 5.1% [2] - By the end of 2024, the total installed capacity of power sources in the GBA will be 136.06 million kW, with clean energy accounting for 76.8% of this capacity, a nearly 20% increase since 2020 [2] - The rapid growth of photovoltaic installations has led to a 15% share in total installed capacity, while offshore wind power in Guangdong has reached 11.98 million kW, ranking first in the country [2] Acceleration of Electrification and Low-Carbon Transition - As of July 2024, the number of electric vehicles in the GBA has surpassed 700,000, with the electric public transport rate in Guangdong reaching 98.6% [3] - Shenzhen has initiated pilot projects for near-zero carbon emission zones, promoting green factories and digital production to enhance energy efficiency and reduce carbon levels [3] - The Nansha district is developing a zero-carbon electric vehicle charging station that integrates photovoltaic, energy storage, and charging capabilities [3] Challenges in Energy and Electricity Development - The GBA has a high dependency on external energy supplies, with local energy production primarily concentrated in Guangdong, leading to a reliance on external coal, oil, and gas [4] - There is a spatial mismatch between energy supply and demand, with local power generation only accounting for 55.9% of total electricity consumption [4] - The interconnectivity of energy transport channels among Guangdong, Hong Kong, and Macao is insufficient, affecting the efficiency of cross-regional energy transport [4] Trends in Energy and Electricity Development - The "14th Five-Year Plan" period is critical for achieving carbon peak targets, with the GBA expected to establish a new energy system by 2028 and reduce total carbon emissions by over 10% by 2035 [6] - The GBA aims to achieve over 90% clean energy installed capacity during this period, significantly increasing the scale of green electricity [6] - The integration of artificial intelligence in energy systems is anticipated to enhance operational efficiency and support the development of a digital energy city in Shenzhen [7] Recommendations for Energy and Electricity Development - Optimize the energy structure by exploring deep-sea resources and promoting offshore wind power development [8] - Expand comprehensive energy services and create a multi-dimensional energy network that includes electricity, hydrogen, and heat [9] - Improve collaborative mechanisms for energy dispatch and market transactions, enhancing the integration of the GBA's electricity market with the national unified electricity market [9]

打造能源电力高质量发展“湾区样本” - Reportify