Opus One Gold Corp Resumes Drilling on Its 100% Owned Noyell Gold Project, Abitibi, Quebec
Globenewswire·2026-01-21 14:00

Core Viewpoint - Opus One Gold Corp is advancing its exploration efforts at the Noyell gold project in Quebec, mobilizing two drill rigs and potentially adding a third to expand on previous successful drilling results from 2025 [1][5]. Group 1: Drilling Program Details - The diamond drilling program will consist of approximately 26 holes totaling around 14,000 meters of core, targeting both infill and extension of Zone 1 [2]. - A new target area located approximately 3 kilometers west of Zone 1 will also be tested, where significant gold was reported by previous operators in the 1980s and 1990s [3]. - The new target area is believed to correspond to the same geological structure that hosts Zone 1, with plans to drill five shallow holes in this area [4]. Group 2: Previous Exploration Success - In 2025, Opus One completed 9,000 meters of successful drilling on Zone 1, alongside bio-geochemical sampling and mineralized core studies to characterize the gold-bearing horizon [5]. - The company is focused on expanding its main mineralized zone and developing new quality gold targets on the property [5]. Group 3: Geological Context - The Noyell property is strategically located in the Abitibi mining district, known for its prolific gold mining potential, with Opus One holding assets in both the Val-d'Or and Matagami mineral districts [12].

Opus One Gold Corp Resumes Drilling on Its 100% Owned Noyell Gold Project, Abitibi, Quebec - Reportify