山东能源梁家煤矿:以“减”提效 以“控”促增
Qi Lu Wan Bao·2026-01-22 03:16

Core Viewpoint - Shandong Energy Lvxin Mining's Liangjia Coal Mine focuses on enhancing operational efficiency and sustainable development through cost control and system optimization Group 1: System Optimization and Cost Control - The mine has implemented a series of "slimming" measures to reduce operational costs, including optimizing the ventilation system to lower negative pressure by 740 Pa, which significantly reduces energy consumption [2] - Adjustments to the mining area layout will lead to the closure of completed mining areas, resulting in a projected 1.3% reduction in overall electrical consumption [2] - The mine plans to remove over 8,000 meters of water and drainage pipelines, saving approximately 310,000 yuan in maintenance costs [2] Group 2: Lean Management and Efficiency Improvement - The mine has established a material consumption ledger and implemented a "daily clearing" system to analyze and control material usage, achieving an 11% reduction in material costs compared to the previous year [3] - By conducting market research for procurement, the mine has managed to reduce contract costs by over 3% [3] - The mine aims to save an additional 600,000 yuan this year through meticulous management of controllable expenses [3] Group 3: Risk Management and Financial Efficiency - The mine adheres to strict "dual control" requirements to enhance the efficiency of fund utilization and manage small expenses through a categorized approach [4] - The implementation of a "six precision, six improvement" initiative aims to identify and eliminate waste in production processes [4] - The mine is actively leveraging tax incentives to maximize financial benefits from resource tax reductions and VAT deductions [4] Group 4: Employee Engagement and Cost Reduction Culture - The mine encourages all employees to participate in cost-saving initiatives through activities like "cost-saving idea collection" and lean management training [5] - Employees have proposed various cost-saving measures, resulting in a cumulative savings of 320,000 yuan from 15 implemented ideas [5] - The mine's leadership emphasizes collective effort to enhance operational quality and reduce risks, aiming for high-level development and low-risk operations by 2026 [5][6]

山东能源梁家煤矿:以“减”提效 以“控”促增 - Reportify