Core Viewpoint - The energy supply in Ordos City, Inner Mongolia, is being prioritized during the winter season, with coal and natural gas production ramping up to meet increasing demand for heating and electricity as the New Year approaches [1][3][4]. Group 1: Coal Supply - The Nalinhe No. 2 Coal Mine in Ordos is operating at a daily coal production of 24,000 tons, ensuring the stable dispatch of three trains of electricity coal daily to southern power plants [1]. - Ordos City is tasked with supplying 560 million tons of electricity coal by 2025, with daily coal production exceeding 2.5 million tons [1][6]. - The Lianchuang Hantai Chuanbei Coal Logistics Park is a key hub for coal transportation, expected to handle over 2,300 train deliveries and a dispatch volume exceeding 16.5 million tons by 2025 [3]. Group 2: Natural Gas Supply - The Sudong 39-61 gas storage facility is operational, with a capacity of 750 million cubic meters, supplying over 48 million cubic meters of natural gas during the peak winter heating season [3]. - The gas storage facility acts as an underground reserve, injecting surplus gas during off-peak seasons and releasing it during high-demand periods [3]. Group 3: Renewable Energy - Ordos is utilizing high-voltage direct current transmission to deliver clean energy, with wind turbines generating electricity that is transmitted to distant regions [4]. - The Yikexia Converter Station is a critical node in the "Mont Electricity into Shandong" project, with an average daily electricity delivery of approximately 160 million kilowatt-hours, enough to meet the daily needs of 25 million households [5]. - By 2025, Ordos aims to achieve a renewable energy generation of 31.04 billion kilowatt-hours, representing a 68.7% increase, with renewable energy capacity expected to surpass coal power [5]. Group 4: Integrated Energy Supply System - Ordos is developing a comprehensive energy supply system that integrates stable coal production, renewable energy delivery, and gas storage to ensure energy security during critical periods [6]. - The city is focused on optimizing production capacity and ensuring smooth transportation channels to meet energy supply tasks during peak demand periods [6].
鄂尔多斯“暖流”这样涌向全国