Group 1 - The completion of the foundation pit inspection for the second phase of the student dormitory project at Beijing Film Academy marks the transition to the physical construction phase [1][3] - The foundation inspection is a critical step that ensures the stability and durability of the main structure, serving as a "lifeline" for the long-term safety of the project [1][3] - The project will include two dormitory buildings with a total construction area of 20,997 square meters, providing 375 dormitory rooms and 1,508 beds [5][7] Group 2 - The construction will follow strict quality control measures and aims to accelerate the project timeline, targeting completion of the foundation work by late March [3][7] - The project is designed to enhance the accommodation capacity of the Beijing Film Academy, providing essential support for the training of artistic talents [7] - The construction will utilize a combination of cast-in-place structures for the underground part and prefabricated shear wall structures for the above-ground part, ensuring both efficiency and stability [5][7]
北京电影学院怀柔校区二期学生宿舍楼工程完成首段地基验槽
Xin Lang Cai Jing·2026-01-22 09:56