Core Viewpoint - The successful installation of the T55 segment of the Lion Rock Bridge marks a significant milestone for the Lion Rock Channel project, which is a key infrastructure initiative in the Guangdong-Hong Kong-Macao Greater Bay Area, aiming for completion in 2026 [1][2] Group 1: Project Overview - The Lion Rock Channel spans approximately 35 kilometers, connecting Nansha in Guangzhou to Shatian and Humen in Dongguan, featuring a dual-layer design with 16 lanes and 11 interchanges [1] - The Lion Rock Bridge is the world's first double-deck suspension bridge with a main span exceeding 2000 meters, set to achieve five world records upon completion [1] Group 2: Construction Details - The T55 segment weighs 126.6 tons and measures 13.6 meters in length and 6 meters in height, with precision control challenges being addressed through innovative construction methods [2] - The construction team has achieved an average installation speed of one segment every seven days, with current alignment precision within 3 millimeters [2] - The main tower is expected to reach its final height of 342 meters by April 2026, with continuous work planned during the Spring Festival to maintain progress [2]
攻克多个施工难题,狮子洋通道建设迎来新突破
Nan Fang Du Shi Bao·2026-01-23 06:18