Group 1 - The maximum electricity load of the Shanxi power grid reached a historical high of 44.694 million kilowatts on January 21, driven by a strong cold air mass affecting the region since January 19 [1] - The Shanxi power grid experienced four consecutive historical peaks in electricity load, with the previous highs recorded at 44.4298 million kilowatts on January 19, 44.48 million kilowatts on January 20, and 44.484 million kilowatts on January 21 [1] - The State Grid Shanxi Electric Power Company has implemented 16 key projects to enhance winter peak load capacity, increasing the power supply capability by approximately 3 million kilowatts [1] Group 2 - The cold wave and snow weather have impacted the safe and stable operation of the power grid, prompting the State Grid Shanxi Electric Power Company to utilize various technologies such as ice monitoring and drone snow removal to ensure reliable electricity supply [2] - The company has accelerated the enhancement of the power grid's disaster prevention and mitigation capabilities, modifying 97 transmission lines in micro-topography areas and installing 437 ice monitoring devices on 315 lines [2] - During the cold wave response, over 1,000 personnel, 351 vehicles, and 126 drones were deployed to patrol 2,300 kilometers of transmission lines, conducting ice melting and snow removal operations [2] Group 3 - The State Grid Shanxi Electric Power Company will continue to monitor weather changes closely and strengthen grid operation monitoring and equipment maintenance to ensure reliable electricity supply for the public and economic development during the winter [3]
山西电网用电负荷连续四次创新高
Zhong Guo Neng Yuan Wang·2026-01-23 10:49