Project Overview - The project is named the Shuigou Red Mud Storage Project, initiated by Shandong Lubei Haisheng Biological Co., Ltd, located approximately 20 km northeast of the existing plant in Shandong [1] - The total investment for the project is 553.1044 million yuan, covering an area of 1.401 million m², with the red mud storage area occupying 1.398 million m² and the filter press workshop covering 3,000 m² [1] - The storage facility is designed to store 2.6 million tons of red mud per year, with a moisture content of 30% after filtration [1] Storage Capacity and Design - The storage facility will be constructed in two phases, A and B, with A having a volume of 10.275 million m³, usable for 4.6 years, and B having a volume of 11.09 million m³, usable for 4.8 years [1] - Upon merging and raising the two areas, the combined volume will be 8.584 million m³, usable for 3.5 years [1] - The total storage capacity is 29.949 million m³, with a designed height of 32.3 meters, intended to serve for 13 years, classified as a Class III facility [1] Environmental Impact Assessment - The environmental impact assessment report (draft) has been completed and is available for public review [1] - The public consultation period for feedback on the project is from January 23, 2026, to February 6, 2026 [1] - Stakeholders include nearby communities and natural reserves, with various methods available for public input, including online forms and direct contact with the company [1]
山东鲁北海生生物有限公司水沟赤泥堆场
Xin Lang Cai Jing·2026-01-23 16:48