Group 1 - The successful rotation of the T-beam at the Juyuan Bridge marks the completion of the last major challenging bridge engineering task for the Zhujiang-Zhaoqing High-Speed Railway project [1][3] - The Juyuan Bridge spans 975.34 meters and features a T-beam design that crosses the Guangzhu Railway at a 42.85-degree angle, with a total weight of 8,000 tons [3] - The rotation process was executed with precision, controlling the error to millimeter levels, and involved real-time monitoring and dynamic scheduling to ensure successful completion [3] Group 2 - Upon completion, the Zhujiang-Zhaoqing High-Speed Railway will connect Jiangmen Station with the Pearl River Delta Hub Airport, enhancing transportation efficiency across major cities in the region [5] - The railway will enable one-hour access between key cities in the Pearl River Delta, significantly reducing travel times, such as 35 minutes from Zhuhai to the airport and 36 minutes from Zhuhai to Zhaoqing East [5]
途经江门!这条高铁有新进展丨早安,江门
Xin Lang Cai Jing·2026-01-25 00:45