Core Viewpoint - The successful completion of the tunneling for three sections of the Qingdao Metro Line 5 marks a significant step towards the full operational opening of the line, which is crucial for enhancing the urban rail transit network in Qingdao [1] Group 1: Project Details - The "Ruian" shield machine has completed tunneling for the sections from Ruichang Road Station to Huda Island Station, Huda Island Station to Haiyun'an Station, and Haiyun'an Station to Sifang Factory Station [1] - The total length of the three sections that have been completed is 2.5 kilometers, with the construction facing significant challenges due to over 50 risk sources in the area [1] Group 2: Technical Aspects - The project involves complex construction requirements, including tunneling under the Jiaozhou-Jinan Railway, Ruichang Road Interchange, and densely populated residential areas, necessitating strict safety and environmental protection measures [1] - The project team has achieved a high standard of "zero settlement" during the tunneling process, with real-time monitoring of the shield machine's operational parameters and precision control to the millimeter level [1]
青岛地铁5号线建设迎来新进展
Xin Lang Cai Jing·2026-01-26 21:05