CANADA CARBON COMPLETES THIRD DRILLING CAMPAIGN ON ASBURY GRAPHITE PROPERTY

Core Insights - Canada Carbon Inc. has completed a third drilling campaign at its Asbury Graphite Property, enhancing its resource evaluation and de-risking efforts [1][4] - The drilling program, which took place from November 4 to December 10, 2025, achieved 2,517 meters of drilling out of a planned 5,200 meters, contributing to a total of over 7,500 meters of core samples from previous campaigns [2][4] - The company aims to update its NI 43-101 resource report and complete a pre-feasibility study by June 30, 2026, following its maiden resource estimate of 4.14 million tons with an average grade of 3.05% Cg [4] Drilling Campaign Details - The recent drilling campaign focused on the Northeast and Southwest portions of the Asbury property, which is located near Notre-Dame-du-Laus, Quebec [1] - Historical data indicates that Asbury was an operational graphite mine from 1974 to 1988, producing high-quality concentrate [4] - The results from the Fall 2023 drilling campaign included significant graphite grades, such as 12.25% Cg over 22.50 meters [8] Future Plans and Expectations - The company is optimistic about the commercial potential of the Asbury project and its contribution to the local economy and Quebec's strategic mineral development efforts [4] - Canada Carbon is committed to maintaining high standards of social and environmental responsibility while developing its graphite deposits [13]