Core Insights - Midnight Sun Mining Corp. has reported significant assay results from its drilling program at the Dumbwa Target in Zambia, demonstrating a mineralized strike length of over 3.6 kilometers [2][5][15] - The ongoing drilling program aims to further delineate the copper system, with a total of 122 holes completed and plans for an additional 140 holes to test the mineralized corridor [5][15] - The company emphasizes the geological similarities between the Dumbwa Target and the nearby Lumwana Mine, which supports the potential for a significant copper deposit [13][15] Drilling Results - The drilling program has yielded multiple intercepts of copper mineralization, with notable results including: - DBW-25-021: 0.89% Cu over 25 meters, with four separate mineralized zones [3] - DBW-25-030: 0.46% Cu over 50 meters, including 1.36% Cu over 6 meters [3] - DBW-25-027: 0.48% Cu over 21.85 meters [4] - The drilling results indicate consistent copper mineralization, reinforcing the company's confidence in the scale of the Dumbwa system [2][5] Future Plans - The company plans to conduct approximately 25,000 meters of drilling to further explore the mineralized corridor over the next 3 kilometers [5] - An additional 64 drill hole samples have been submitted for assay, with ongoing preparations for the remaining samples [5] Quality Control - The drilling was conducted using a conventional diamond drilling rig, with strict quality control measures in place, including sample handling and laboratory analysis by SGS Labs in Zambia [8]
Midnight Sun Drills 0.89% Copper Over 25 Metres and 1.36% Copper Over 6 Metres within 0.46% Copper Over 50 Metres; Continuing to Significantly Extend Dumbwa System