石家庄地铁五号线一期工程建设有序推进
Xin Lang Cai Jing·2026-01-29 22:56
Core Viewpoint - The construction of the Shijiazhuang Metro Line 5 Phase I is progressing smoothly, with significant milestones achieved in the project [3]. Group 1: Project Overview - The Shijiazhuang Metro Line 5 Phase I has a total length of 19.9 kilometers [3]. - Out of the 19 stations, the main structure of 8 stations has been capped [3]. - 9 sections of the double track have been completed, and 3 sections of the single track have been connected [3].