合武高铁大别山隧道进口掘进突破2000米大关
Zhong Guo Jing Ji Wang·2026-02-01 05:46

Core Viewpoint - The construction of the Dabieshan Tunnel, a key project of the Hefei-Wuhan High-Speed Railway, has made significant progress with the breakthrough of 2000 meters in excavation, highlighting the project's importance and complexity [1] Group 1: Project Overview - The Dabieshan Tunnel is the longest tunnel in the Hefei-Wuhan High-Speed Railway, with a total length of 14,698 meters [1] - The tunnel's maximum burial depth reaches 801.2 meters, and it primarily consists of II and III grade surrounding rock, indicating challenging geological conditions [1] Group 2: Construction Challenges - The tunnel construction faces high safety risks due to complex geological formations, including multiple fault zones that can lead to rock falls and collapses [1] - The project has implemented a "seven management" initiative to address these challenges and enhance safety [1] Group 3: Technological Innovations - The construction employs fully mechanized operations across all processes, utilizing advanced equipment such as advanced geological drilling rigs and large rock drilling vehicles [1] - Innovative small tools have been developed to improve construction efficiency, including self-made concrete pouring diversion devices and high-pressure water guns [1] Group 4: Strategic Importance - The Hefei-Wuhan High-Speed Railway is a crucial part of the Shanghai-Chongqing-Lanzhou high-speed rail corridor, connecting various major railways and enhancing regional connectivity [1] - Once completed, the railway will create a fan-shaped high-speed rail network, significantly contributing to the development of the central region and revitalizing the Dabieshan revolutionary old area [1]

合武高铁大别山隧道进口掘进突破2000米大关 - Reportify