海南三亚凤凰国际机场T3航站楼今日起试运行
Yang Shi Xin Wen Ke Hu Duan·2026-02-01 06:08

Core Viewpoint - The Sanya Phoenix International Airport's T3 terminal has commenced trial operations, incorporating smart construction and green energy-saving technologies, aimed at enhancing transportation capacity during the upcoming Spring Festival travel rush and supporting the Hainan Free Trade Port's operations [1] Group 1: Infrastructure Development - The T3 terminal is a significant expansion project for Hainan's civil aviation during the 14th Five-Year Plan period and serves as a key pilot project for the airport cluster construction in Hainan Free Trade Port [1] - The terminal features a layout with 40 check-in counters, 23 security inspection channels, and 7 fixed boarding bridges, facilitating a mixed flow of incoming and outgoing flights [1] Group 2: Capacity and Growth - Initially designed for an annual passenger throughput of 1.5 million, the airport's capacity has increased significantly, with projections indicating a throughput of over 22.68 million passengers by 2025, marking a historical high since its inception [1] - Following the operation of the T3 terminal, the airport's annual passenger throughput is expected to reach 30 million [1] Group 3: Environmental Considerations - The construction of the T3 terminal has integrated green and low-carbon principles throughout the process, transforming the terminal from a traditional "energy consumer" to a self-sufficient "energy production unit" [1] Group 4: Future Operations - For the 2026 Spring Festival, the airport anticipates executing 18,600 flights and transporting approximately 3.493 million passengers, leveraging the T3 terminal's operational advantages to alleviate pressure on existing terminals [1]

海南三亚凤凰国际机场T3航站楼今日起试运行 - Reportify