Core Insights - Liaoning Hongyanhe Nuclear Power Co., Ltd. achieved a record high of 49.15 billion kilowatt-hours in electricity generation for the year 2025 [1] - The total cumulative electricity generation from the six units reached 380.869 billion kilowatt-hours [1] Group 1: Operational Achievements - Hongyanhe Nuclear Power Station, located in Dalian, Liaoning, is the first nuclear power plant in Northeast China and serves as the region's largest power energy base [2] - The plant's total installed capacity is 6.71 million kilowatts, with a total investment of 90 billion yuan [2] - In 2025, all six units operated under full control, maintaining good nuclear safety status without any unplanned shutdowns, achieving safety production goals [2] Group 2: Environmental Impact - By the end of 2025, the cumulative electricity generation resulted in a reduction of approximately 11.5 million tons of standard coal consumption and a decrease of about 35.2 million tons of carbon dioxide emissions [5] - This reduction is equivalent to creating a forest area of 857,000 hectares in the Liaoning region [5] Group 3: Heating Project - The first nuclear energy heating project in Northeast China was launched in November 2022, utilizing steam from the Hongyanhe Nuclear Power Station to replace 12 coal-fired boiler rooms in Hongyanhe Town [5] - The heating project has been operational for four heating seasons, providing effective heating for nearly 20,000 residents during winter [5]
辽宁红沿河核电2025年全年实现上网电量491.5亿千瓦时 创历史新高
Zhong Guo Xin Wen Wang·2026-02-02 06:21