日处理4500吨!中西部最大垃圾发电项目完成72+24小时满负荷试运行

Core Viewpoint - The Zhengzhou (Western) Environmental Energy Project, constructed by China Electric Power Construction, has successfully completed a 72+24 hour full-load trial operation, laying a solid foundation for its official operation. Group 1: Project Overview - The project is located in Cuimiao Town, Xingyang City, Henan Province, and is the largest, highest standard, and best emission index waste-to-energy project in the province [1][2]. - The design capacity for daily waste processing is 4,500 tons, utilizing an advanced three-stage grate incineration technology, along with facilities for fly ash stabilization, flue gas purification, and leachate treatment, achieving "zero landfill for solid waste and no wastewater discharge" [6][2]. Group 2: Technological Innovations - During construction, the project team employed BIM technology for digital management, enhancing aesthetic quality while saving costs and shortening the construction period [3][5]. - The project has achieved multiple technical breakthroughs, resulting in four construction method outcomes, four quality control outcomes, and nine national patent applications, providing valuable experience and a model for similar environmental energy projects [3][5]. Group 3: Environmental Impact - Once fully operational, the project will process approximately 1.46 million tons of municipal waste annually, generate nearly 650 million kilowatt-hours of green electricity, and reduce carbon emissions by 510,000 tons, equivalent to 190,000 tons of standard coal [7][2]. - The project is expected to significantly alleviate urban waste disposal pressure and enhance the comprehensive utilization of energy, supporting high-quality green development in the region [7][2].

日处理4500吨!中西部最大垃圾发电项目完成72+24小时满负荷试运行 - Reportify