Group 1 - The core viewpoint emphasizes the acceleration of the construction of a new energy system in China, aiming for high-quality development of renewable energy to ensure reliable energy supply for modernization efforts [1] - During the 14th Five-Year Plan, a demonstration area for a 100% renewable energy power system was established in Guangshui, Suizhou, showcasing a grid model that balances supply and demand with over 70% of the time powered by renewable energy [1] - The new energy power system in northern Hubei has a capacity exceeding 10 million kilowatts, covering an area of nearly 30,000 square kilometers and serving a population of 10 million, creating a new collaborative path for energy resource utilization [1] Group 2 - The company is actively exploring the construction of a clean and low-carbon energy system in rural areas, utilizing organic waste to generate clean energy and promoting a replicable rural energy model [2] - An example from Tudianzi Village in Enshi shows that the village has achieved 24-hour clean energy supply, leading to increased agricultural productivity and tourism revenue of 1.37 million yuan annually [2] Group 3 - The 15th Five-Year Plan is expected to be a period of rapid development for renewable energy and the comprehensive construction of a new power system in China [3] - Hubei Electric Power Company is initiating projects to develop and consume renewable energy in densely populated areas and to facilitate the transmission of electricity from remote renewable energy bases to Hubei and beyond [3]
新能源供给圈持续扩大
Jing Ji Ri Bao·2026-02-02 22:13