湖南首个光伏矿山项目竣工
Zhong Guo Dian Li Bao·2026-02-03 02:07

Core Viewpoint - The first "Photovoltaic + Green Mining" demonstration project in Hunan, the distributed photovoltaic project at Xintianling Tungsten Mine in Chenzhou Beihu District, has successfully passed completion acceptance, integrating photovoltaic power generation with ecological restoration and production operations in mining [1] Group 1: Project Overview - The project is located in the Xintianling area of Chenzhou, Hunan Province, utilizing idle space in the mining area for the construction of a distributed photovoltaic power generation project [1] - It includes 11 closed tailings ponds, abandoned factories, waste soil disposal sites, and one rooftop area, covering a total area of approximately 540 acres with a direct current installed capacity of 43.3344 megawatts [1] Group 2: Environmental Impact - Once operational, the project is expected to generate over 40 million kilowatt-hours of electricity annually, saving 11,400 tons of standard coal and reducing carbon dioxide emissions by 34,300 tons each year [1] - The project plays a significant role in optimizing the regional energy structure and alleviating the power supply pressure on the Chenzhou grid [1]