Core Viewpoint - The Shandong Taishan Pumped Storage Co., Ltd. is advancing multiple pumped storage projects to enhance energy efficiency and contribute to carbon reduction goals in Shandong Province [1][2][3] Group 1: Company Overview - Established in 1999, Shandong Taishan Pumped Storage Co., Ltd. has a registered capital of 2.60081 billion RMB, with investments from State Grid Xinyuan Group (50.29%), State Grid Shandong Electric Power Company (43.39%), and Taishan Investment Co., Ltd. (6.32%) [1] - The company manages two pumped storage power stations: the first phase with a total investment of 4.3 billion RMB and a capacity of 1 million kW, and the second phase with a planned investment of 10.748 billion RMB and a capacity of 1.8 million kW [1][2] Group 2: Project Details - The first phase of the Taishan pumped storage power station has been operational since June 2007, achieving an average of over 3,000 starts per year, and saving 434,000 tons of standard coal and 255,000 tons of fuel annually [1] - The second phase is designed to generate 1.8 billion kWh annually and pump 2.4 billion kWh, with a focus on domestic technology breakthroughs in variable-speed units [2] - The third phase, with a total investment of 2.6 billion RMB and a capacity of 450,000 kW, is expected to start construction during the 14th Five-Year Plan period and be completed by 2033 [3] Group 3: Environmental Impact - The second phase of the project is projected to save 784,000 tons of standard coal annually and reduce emissions of CO2 by 1.3 million tons, SO2 by 28,700 tons, and NOx by 3,300 tons [2] - The company aims to contribute to the establishment of a "green and low-carbon energy transition demonstration zone" in Shandong Province, aligning with national carbon peak and carbon neutrality goals [3]
能源绿色低碳转型”看山东之国网新源泰山抽水蓄能:守护电网安全,助建“储能之都
Zhong Guo Fa Zhan Wang·2026-02-04 06:31