Core Insights - Military Metals Corp. has reported positive results from its drilling campaign at the Trojárová Antimony-Gold Project in Slovakia, confirming historical drilling results and indicating higher than expected gold grades [1][3] - The project is significant as it is the only antimony deposit in the European Union being advanced by modern exploration, aligning with the EU's goal of securing a domestic supply of critical minerals [3] Drilling Campaign Results - The results from hole 25-TVA-003 show consistent antimony grades and higher gold grades than anticipated, with notable intervals yielding 3.3 g/t gold over a true width of 20.2 meters [3][6] - Specific highlights include 4.0 meters of 10.52 g/t gold and 1.9 meters of 2.53% antimony, indicating strong mineralization potential [6] Project Background - The Trojárová Project has a historical resource estimate of 2.46 million tonnes averaging 2.47% antimony and 0.635 g/t gold, based on extensive exploration conducted from the 1980s to the 1990s [17][19] - The historical data is considered relevant for planning future exploration programs, although it has not been classified as current [20] Analytical Procedures - The drilling program utilized PQ and HQ sized drill core, with samples analyzed by ALS Laboratories in Romania using established geochemical methods [13][14] - A systematic QA/QC protocol was employed, including the insertion of certified reference materials and blank samples to ensure data reliability [15]
Military Metals Drills 23.5 Meters of 3.3 g/t Gold Including 4.0 Meters of 10.52 g/t Gold and 1.9 Meters of 2.53% Antimony at Flagship Trojarova Project, Europe
TMX Newsfile·2026-02-04 13:30