Core Viewpoint - The addition of two new electric vehicle (EV) dedicated flat-top barges in Haikou enhances the capacity for transporting EVs during the Spring Festival travel rush, increasing the overall transport capability by 40% [1] Group 1: Transportation Capacity - Haikou has introduced two new dedicated barges for electric vehicles, named "Green Source No. 6" and "Green Source No. 9" [1] - The total number of dedicated barges operating between Haikou Xiuying Port and Zhanjiang Xuwen Haian New Port has reached four [1] - The transport capacity for EVs has been improved by 40% due to these additions [1] Group 2: EV Transport Statistics - On the first day of the Spring Festival travel rush, a total of 1,449 electric passenger vehicles departed from Haikou's three ports, with 1,267 vehicles (87%) leaving from Xiuying Port [1] - On February 3, 1,316 electric passenger vehicles departed, with 1,181 vehicles (89.7%) leaving from Xiuying Port [1] - Nearly 90% of electric vehicles left from Xiuying Port during the first two days of the Spring Festival travel rush [1] Group 3: Operational Strategy - This year's Spring Festival travel rush has implemented a "fuel-electric separation" strategy for outbound vehicles, directing electric vehicles primarily to Xiuying Port [1] - The advantages of this strategy include a high frequency of daily sailings (over ten) and sufficient transport capacity, which helps reduce waiting times for vehicles [1] - It is recommended that electric vehicles prioritize Xiuying Port for ferrying [1]
春运前两日 近九成新能源车从海口秀英港出岛
Hai Nan Ri Bao·2026-02-05 06:42