Core Insights - The successful delivery of the heat exchanger module for the 350MW flue gas molten salt energy storage demonstration project marks a significant achievement for Harbin Boiler Company in the energy storage sector, laying a solid foundation for the engineering application of the world's first flue gas molten salt heat exchange technology [1][2] Group 1: Project Overview - The project is part of the national third batch of major technological equipment projects in the energy sector, aimed at optimizing energy structure and ensuring stable energy supply [1] - The goal is to build a world-leading flexible coal-fired power generation unit, providing a demonstration model for the integration of flexible coal unit transformation and new energy storage [1] Group 2: Technical Achievements - The unit's peak shaving rate will reach 6% Pe/min, making it the fastest responding molten salt coupled thermal power unit globally, with all performance indicators meeting international leading levels [1] - The project faced challenges in modular integration and dense tube arrangement, which were addressed through innovative design and high-precision welding techniques, ensuring quality and efficiency in manufacturing [2] Group 3: Future Directions - Harbin Boiler will continue to focus on technological innovation in the new energy sector, optimizing and iterating on flue gas molten salt storage technology, and promoting the first set of technologies to contribute to the transformation of China's energy structure [2]
哈电锅炉承制世界首台套烟气熔盐储能项目关键模块成功发运
Xin Lang Cai Jing·2026-02-05 22:20