青海水利“十五五”惠民蓝图出炉
Xin Lang Cai Jing·2026-02-06 17:54

Group 1 - The core objective of the water resources strategy in Qinghai Province is to achieve a river embankment compliance rate of over 95% by the end of the 14th Five-Year Plan, with a target of reducing water usage per unit of GDP and ensuring a water supply safety coefficient of 1.15 [1] - The province aims to utilize over 130 million cubic meters of unconventional water and improve the effective utilization coefficient of irrigation water in farmland to 0.52, while increasing the rural self-supplied water coverage rate to 88% [1] - Key ecological flow compliance rates for major rivers and lakes are targeted to reach over 90%, with a digitalization rate of major water conservancy projects set at 44% [1] Group 2 - The development path focuses on ensuring flood safety and establishing a new framework for disaster prevention, including the construction of high-standard flood control projects along the Yellow River and the management of tributaries and small rivers [2] - The strategy includes the integration of various water monitoring systems to enhance flood forecasting accuracy and extend the lead time for flood warnings [2] - The plan emphasizes the importance of unified scheduling and emergency response mechanisms to protect vital infrastructure and public safety [2] Group 3 - The initiative aims to create a comprehensive and efficient highland water network, enhancing the benefits of major water diversion projects and ensuring the integration of water supply systems [2] - The focus is on modernizing irrigation systems and improving water distribution capabilities, with a goal of achieving a 50% coverage of rural populations by centralized water supply [2] - The strategy includes the implementation of a rigid water resource constraint system to manage water usage effectively and enhance soil and water conservation efforts [3]

青海水利“十五五”惠民蓝图出炉 - Reportify