中煤4×1000MW煤电项目可行性研究报告评审会召开
Xin Lang Cai Jing·2026-02-09 10:09

Core Viewpoint - The feasibility study report review meeting for the coal power projects at the Longqing Bridge and Lintai Chemical Park in Gansu Province marks a significant step towards the implementation of the coal power projects associated with the Longdong Comprehensive Energy and Chemical Base [1][4]. Group 1: Meeting Overview - The meeting was held from February 3 to 6, 2023, in Qingyang City, Gansu Province, and was hosted by the Electric Power Planning and Design Institute [1][4]. - Over 100 representatives from various government departments and companies, including China Coal Energy Group and China Coal Power Co., attended the meeting [1][4]. Group 2: Site Investigation and Expert Review - Prior to the meeting, an expert group conducted site visits to the proposed locations in Qingyang and Lintai, focusing on key aspects such as land planning, water resource assurance, solid waste utilization, and transportation conditions [2][5]. - The expert group acknowledged the favorable conditions for constructing large coal power projects at the selected sites, providing a solid basis for the feasibility report [2][5]. Group 3: Feasibility Report Content - The Northwest Electric Power Design Institute presented the feasibility report, covering project site selection, technical routes, environmental measures, investment estimates, and economic benefit analysis [2][5]. - Experts reviewed the report comprehensively, discussing technical feasibility, economic rationality, and environmental compliance, and provided optimization suggestions for the project's advancement [2][5]. Group 4: Future Steps - The project leaders expressed their commitment to incorporating expert feedback to expedite the completion of the feasibility report and advance project approval processes, aiming for an early start of construction [6]. - The successful hosting of the review meeting not only provided scientific support for the project's preliminary verification but also fostered consensus among stakeholders for the collaborative advancement of the Longdong Energy Base [6].

中煤4×1000MW煤电项目可行性研究报告评审会召开 - Reportify