南方电网深圳供电局:全力保障春运及春节期间电力供应
Xin Lang Cai Jing·2026-02-09 12:03

Group 1 - The core viewpoint of the articles highlights the proactive measures taken by the Shenzhen Power Supply Bureau to ensure reliable electricity supply during the 2026 Spring Festival travel season [1][2] - The Shenzhen Power Supply Bureau has organized 99 emergency repair teams and over 180 emergency power generation vehicles to quickly address unexpected power outages [1] - Digital monitoring techniques are being employed for precise control of equipment, including an intelligent upgrade of the power distribution room at Shenzhen North Station, enabling full video surveillance and remote inspections [2] Group 2 - Continuous 24-hour intelligent monitoring of key areas such as overhead lines and substations will be conducted to actively defend against risks related to the power grid, equipment, and operations during the Spring Festival [2] - The Shenzhen Power Supply Bureau's production operation support system will play a crucial role in ensuring the safe and stable operation of equipment throughout the city [2][3]

南方电网深圳供电局:全力保障春运及春节期间电力供应 - Reportify