【新春走基层】在雄安地下,与“0.5毫米”较真
Xin Lang Cai Jing·2026-02-09 20:20

Core Viewpoint - The construction of the Xiong'an International Trade Center is progressing rapidly, with a focus on high-quality standards and meticulous attention to detail in both architectural and mechanical engineering aspects, positioning it as a key hub for future connectivity in the region [1][2][3]. Group 1: Project Overview - The Xiong'an International Trade Center project broke ground in August 2022 and features a unique architectural design with nine buildings that shape the skyline of Xiong'an [1]. - The project includes a city terminal for the Beijing-Xiong'an Express Line, which will provide a 30-minute connection to Beijing Daxing International Airport and a one-hour connection to the Lize Business District [2]. - The underground structure consists of three levels: the city layer, hall layer, and platform layer, facilitating seamless transfers between multiple transportation lines [2]. Group 2: Quality Control and Standards - The project implements a "sample first" approach, ensuring that all materials are sourced and verified for quality, with project leaders personally selecting materials from suppliers [2]. - Strict quality standards are enforced, with detailed inspections of every aspect of construction, including tile gaps and safety measures, to ensure compliance with high standards [2][3]. - Mechanical and electrical systems are treated with equal rigor, with tolerances for installation errors set at a maximum of 5 millimeters, emphasizing the importance of precision in the project's execution [3]. Group 3: Project Management and Team Commitment - The project management team is dedicated to maintaining high standards, with continuous oversight of all construction processes to ensure timely completion [3][4]. - The commitment of the engineering team is evident, as they work through challenging conditions, including winter weather, to meet project deadlines [4]. - Team members express a strong sense of pride in their contributions, viewing their work as part of a significant national project that will serve as a landmark for the Xiong'an New Area [4][5].

【新春走基层】在雄安地下,与“0.5毫米”较真 - Reportify