Core Viewpoint - Changji Guotou Xin Energy Development Co., Ltd. has announced a tender for four shared energy storage projects with a total scale of 800MW/3.2GWh, focusing on advanced battery technologies comparable to leading companies in the industry [2][3]. Group 1: Project Overview - The total scale of the energy storage projects is 800MW/3.2GWh, with specific projects including: - Changji Guotou Hutu Bih County: 200MW/800MWh - Changji Guotou Mulei County: 300MW/1200MWh - Changji Guotou Jimusaer County: 100MW/400MWh - Changji Guotou Qitai County: 200MW/800MWh [3][18][30]. - The tender includes a comprehensive range of equipment such as lithium iron phosphate battery storage, battery management systems (BMS), power conversion systems (PCS), energy management systems (EMS), and associated fire protection systems [3][18][30]. Group 2: Technical Requirements - The technical requirements for the battery cells are to be comparable to those of leading companies such as CATL, Hicharge Energy, Yiwei Lithium Energy, and others [2][9][21]. - The delivery period for the equipment is set to be completed within 90 calendar days from the issuance of the supply notice after the contract is signed [3][18][30]. Group 3: Tendering Process - The tender is open to independent legal entities registered in the People's Republic of China, with specific qualifications required for bidders, including experience in energy storage systems [7][20][30]. - A bid security of 500,000 yuan is required, and the tender documents can be downloaded from the Changji Public Resources Trading Network [23][31].
3.2GWh!昌吉国投4个储能项目招标!要求宁德时代/海辰储能/亿纬锂能/中创新航等10家电芯厂商