Core Insights - The surge in electric vehicle (EV) usage during the Spring Festival has led to increased concerns about charging infrastructure and wait times for EV owners [1] - State Grid Jiangsu Electric Power Company has significantly enhanced charging capabilities, with over 3,500 charging piles constructed, marking a 70% year-on-year increase [1] - The average daily exit flow on Jiangsu highways is expected to exceed 3.4 million vehicles during the holiday, representing a 4.5% increase year-on-year, which will drive up charging demand [1] Group 1 - State Grid Jiangsu Electric Power has deployed 72 mobile charging terminals on busy highways to ensure emergency charging capabilities [1] - A mobile charging robot has been introduced at the Wuxi Meicun service area, allowing for a more efficient charging experience by transitioning from "car finding piles" to "piles chasing cars" [1] - The company has established a dedicated operation and maintenance team, with 4,500 personnel on-site 24/7 during the holiday to assist with charging issues [2] Group 2 - It is predicted that the total charging volume at State Grid charging stations will exceed 9 million kilowatt-hours during the nine-day holiday, setting a new historical record [3] - Targeted guidance measures have been implemented at 46 popular service areas based on previous holiday charging data to alleviate peak charging pressures [3] - Differentiated discount coupons will be issued based on charging duration to encourage quick charging and optimize resource utilization at less busy stations [3]
新春畅行江苏,新能源车如何实现“充电无忧”?
Jiang Nan Shi Bao·2026-02-11 08:21