Core Viewpoint - During the "14th Five-Year Plan" period, the renewable energy generation capacity in Qinghai's Mangya City is expected to grow significantly, with an annual increase of 150% in renewable energy generation [1][3]. Group 1: Renewable Energy Capacity - Mangya City has achieved a cumulative installed capacity of 5.12 million kilowatts for renewable energy [1]. - The region is leveraging its abundant solar and wind resources, with over 3,400 hours of annual sunshine and an average annual solar radiation of 6,800 megajoules per square meter [1]. Group 2: Project Developments - Key projects include the 2 million kilowatt wind power project in Haixi Prefecture and the 1 million kilowatt wind power project by CRRC in the Mangya Cold Lake area, both of which are now operational [3]. - By 2026, Mangya City aims to accelerate the integrated green transformation of wind and solar energy, targeting a cumulative power generation of 8 billion kilowatt-hours, which will save 983,200 tons of standard coal and reduce carbon dioxide emissions by 7.976 million tons [3].
“十四五”时期 青海茫崖新能源发电量年均增长150%
Zhong Guo Xin Wen Wang·2026-02-13 01:43