Core Viewpoint - The construction of the subway Line 1 branch is a critical phase, requiring temporary station closures from February 15, 2026, to the end of May 2026 to ensure safe and efficient integration with the existing Line 1 [1][2]. Group 1: Construction Details - The temporary closure involves the stations Gucheng and Babao Mountain, with the operational segment changing to Yuyuan Road to Universal Resort, where trains will turn back at Yuyuan Road [1]. - The construction plan spans approximately three and a half months, focusing on structural modifications, signal cable relocation, and track installation [2]. - The project faces significant challenges, including high construction difficulty, complex procedures requiring multi-disciplinary collaboration, and the need for synchronization with other ongoing upgrades [2]. Group 2: Passenger Service Enhancements - To manage the expected increase in passenger flow at Yuyuan Road station, additional security checks and staff will be deployed during peak hours, along with a revised train operation strategy [3][6]. - The subway operator has implemented seven measures to ensure passenger safety and orderly travel during the station closures, including enhanced signage and real-time information updates [5][8]. - A dynamic management system will be established to assess passenger flow and adjust operational plans accordingly [11]. Group 3: Public Transport Coordination - Ground transportation will include the introduction of a shuttle service connecting to Yuyuan Road station, with increased bus capacity on existing routes to accommodate displaced passengers [11][14]. - Recommendations for alternative bus routes have been provided to facilitate passenger transfers to other subway lines during the closure [16]. - The addition of approximately 3,000 non-motorized vehicle parking spaces at Yuyuan Road and Yangzhuang stations aims to address increased parking demand during the construction period [17]. Group 4: Communication and Public Awareness - The transportation authority encourages citizens to stay informed about the station closures and transportation measures, promoting the use of public transport and adherence to traffic regulations [21].
【出行服务】北京地铁1号线支线15日起启动接轨改造 1号线古城、八宝山站临时封站 公交、地铁、非机动车联动保障出行
Bei Jing Ri Bao Ke Hu Duan·2026-02-15 05:43