Group 1 - Southern Petrochemical Group has completed customs clearance for a batch of equipment, marking the first core equipment shipment for the development of the Jiarou oil field in Congo (Brazzaville) [3] - The shipment includes drilling rigs, large steel components, fracturing equipment, and engineering vehicles, with a total weight exceeding 30,000 tons, expected to arrive at the Black Point Port in Congo (Brazzaville) in 30 days [3] - The Jiarou oil field project is a key initiative under the Belt and Road Initiative, with Southern Petrochemical Group responsible for its investment, construction, and operation [3] Group 2 - The oil field is located in the Black Point area of Congo (Brazzaville) and is divided into southern and northern blocks, with the current development focusing on the northern block's Holmoni oil field [3] - The overall development plan has been approved, and it will proceed alongside a comprehensive utilization project for associated natural gas and a supporting industrial park, contributing to local industrialization and energy sector upgrades [3] - To ensure timely shipment of critical materials, Tianjin Customs has opened a dedicated "green channel" for major projects, providing priority processing and one-on-one guidance to avoid declaration errors [3]
共建“一带一路”重点项目核心装备在津启运
Xin Lang Cai Jing·2026-02-16 19:19