Core Points - The article discusses the transportation connectivity and services at Qinghe Station, highlighting the integration of high-speed rail and subway systems, as well as various public transport options available for passengers. Group 1: Subway Connectivity - Qinghe Station is served by two subway lines: Line 13 and Changping Line, with mutual recognition of security checks between high-speed rail and subway systems [1] - The operational schedule for Line 13 includes the first train to Xizhimen at 5:13 AM and the last train at 11:29 PM, while the schedule for Changping Line includes the first train to Changping Xishankou at 5:21 AM and the last train at 11:39 PM [2] Group 2: Bus Services - There are six daytime bus routes and one nighttime bus route available at Qinghe Station, providing additional transport options for passengers [3] Group 3: Taxi Services - The taxi dispatch station is located south of the west square of Qinghe Station, with provisions for passenger drop-off and pick-up [11] - During peak travel periods, additional taxis will be dispatched to accommodate nighttime arrivals, and a "Taxi Home" service area is available for drivers and passengers [11] Group 4: Ride-Hailing Services - The ride-hailing pick-up area is situated in the north underground parking lot of Qinghe Station, with clear signage to guide passengers [12] - A service center is available at the exit, offering amenities such as hot water, warm pads, and assistance for travelers [12] Group 5: Private Vehicle Access - Passengers arriving by private car can utilize various parking facilities, including the north and south underground parking lots and drop-off areas [14] - Specific guidance is provided for nighttime arrivals, indicating that security check channels will be closed after subway operations cease [14]
北京“八站两场”春运出行攻略⑨:清河站
Xin Lang Cai Jing·2026-02-19 04:31