Core Viewpoint - The news highlights the dedication of various personnel in ensuring safety and efficiency in power supply and railway operations during the Chinese New Year holiday, showcasing the use of technology and strategic planning to enhance operational effectiveness. Group 1: Power Supply Operations - The Xiong'an New Area's underground cable tunnel, measuring 11.75 kilometers, is crucial for stable power supply in the region, with electric maintenance personnel utilizing smart inspection robots to enhance efficiency by 80% compared to manual inspections [1][3] - During the Chinese New Year, Jiangsu province's departments organized over 80 workers to relocate the 500 kV Taicheng-Zhoucheng line, taking advantage of the low electricity demand period to ensure reliable power supply in East China and Southern Jiangsu [3][5] Group 2: Railway Safety Operations - The Ningxia Railway Protection Joint Defense Team conducts regular inspections along the railway to ensure passenger safety, checking for hazards such as damaged protective nets and unauthorized personnel [5][7] - The Nanning Railway Bureau's staff are actively inspecting the railway lines during the Spring Festival, addressing potential safety risks posed by loose rocks and vegetation along the tracks [7][9]
坚守在离责任最近的地方 让每一份团圆都温暖踏实
Yang Shi Xin Wen Ke Hu Duan·2026-02-19 07:47