Core Viewpoint - The South-to-North Water Diversion Project's Eastern and Central Line is crucial for supplying water to 195 million people, with efforts being made to ensure water supply safety during the Spring Festival [1] Group 1: Project Management and Safety Measures - Over 4,000 construction and operational management personnel from the South-to-North Water Diversion Group are on duty to safeguard water supply during the Spring Festival [1] - The Taocha Water Diversion Hub, which controls the inflow of the main canal, is undergoing thorough inspections to maintain operational safety [3] - An emergency response team has been established to address any unexpected situations promptly, ensuring stable equipment operation and precise water supply during the holiday [7] Group 2: Technological Advancements - The Taocha Water Quality Automatic Monitoring Station has upgraded its monitoring capabilities using IoT and AI technologies to ensure continuous water quality safety [5] - Intelligent inspection robots are deployed in the hub's power plant to monitor equipment conditions and provide real-time alerts, ensuring comprehensive surveillance [9] - The integration of digital twin technology and a comprehensive monitoring system enhances scientific assessment and precise scheduling for water supply safety in 27 major cities during the Spring Festival [11] Group 3: Ongoing Projects - The Jianghan Water Network Construction Project, as the first follow-up project of the South-to-North Water Diversion, is progressing rapidly with hundreds of workers on-site during the Spring Festival [13] - The main tunnel of the Jianghan project has exceeded 18 kilometers in excavation, with over 35 kilometers of branch tunnels completed, showcasing a collaborative underground operation [13]
春节不停工 他们守护1.95亿人用水“生命线”
Xin Lang Cai Jing·2026-02-20 03:08