Core Insights - The construction of the Shijiazhuang Metro Line 5 is underway, utilizing a specialized large equipment known as a shield machine, which is essential for modern subway construction [1][2] - The operation of the shield machine requires skilled operators, such as the 38-year-old driver Wu Liuyang, who is responsible for adjusting numerous parameters in a challenging underground environment [1] - The ongoing construction aims to enhance the urban transportation network, providing convenience and connectivity for the city's residents [2] Summary by Sections - Construction Equipment: The shield machine integrates excavation, support, and spoil removal, making it a core component of subway construction [1] - Operator's Role: The operator works in a confined, challenging environment, coordinating with various workers to ensure the machine progresses steadily [1] - Future Impact: The completion of Line 5 by the end of 2027 is expected to significantly improve the city's transportation infrastructure, benefiting all citizens [2]
新春走基层 | 他的工位在地下15米
Xin Lang Cai Jing·2026-02-20 13:31