Core Viewpoint - The article highlights the essential role of heat supply personnel in ensuring the safety and efficiency of the heating pipeline network during the winter season, particularly during the Chinese New Year holiday when they remain on duty to perform routine inspections and maintenance [1][5]. Group 1: Personnel and Responsibilities - The team responsible for the heating pipeline network consists of experienced professionals, including Zhou Tong and Guo Xudong, who have been in the industry since 2007 and 2011, respectively [1]. - The heating pipeline network managed by the company spans 262 kilometers across three districts: Xicheng, Haidian, and Fengtai [1]. Group 2: Inspection Process - During inspections, personnel utilize specialized equipment such as thermal imaging cameras and acoustic listening rods to assess the condition of the pipelines [3][4]. - The temperature in the underground inspection areas can reach up to 40 degrees Celsius, creating a stark contrast with the cold surface temperatures, which can differ by as much as 50 degrees Celsius [3]. Group 3: Technology and Monitoring - The company has implemented a "situation awareness system and track inspection robots" for real-time monitoring of underground temperatures and liquid levels, enhancing the ability to detect leaks and anomalies [4]. - The inspection of each well typically takes between 40 minutes to an hour, with a total of 2,210 wells distributed across the network [4]. Group 4: Safety and Maintenance - The personnel are committed to maintaining pipeline safety, which is emphasized as a primary goal during the festive season [5]. - Each worker is responsible for 25 to 30 wells, requiring them to memorize critical information about each well, including its location, valve types, and maintenance history, to ensure quick response during emergencies [4].
新春走基层|14米井下的“热力体检”
Xin Lang Cai Jing·2026-02-22 23:05