Core Viewpoint - The construction of the Houshe River Grand Bridge, a key project of the Zhengluo Expressway, is progressing well, with significant advancements in the main beam construction and the use of advanced technologies for high-altitude work [1][2][3]. Group 1: Project Overview - The Houshe River Grand Bridge is the largest curved beam single-tower cable-stayed bridge in China, with a left tower height of 207.5 meters and a right tower height of 211 meters [1]. - The main beam construction has reached 61% completion, with expectations to complete the bridge deck by October 2023 [1]. Group 2: Construction Techniques - Advanced construction techniques, such as the high-pressure concrete pumping technology capable of reaching heights of 211 meters, are being utilized to facilitate the challenging high-altitude work [2]. - The construction team is focused on ensuring safety by thoroughly inspecting critical components, including the concrete delivery pipes and construction elevators [2]. Group 3: Material Management - The project has ensured that all necessary materials, including steel bars, cement, and concrete, were prepared in advance to meet the demands of the post-holiday work resumption [2]. - The project team is actively monitoring material conditions and quantities to ensure smooth progress [2]. Group 4: Economic Impact - The Zhengluo Expressway, once completed, will serve as the third rapid transit route between Zhengzhou and Luoyang, alleviating traffic pressure between the two cities [3]. - The project is part of a broader initiative to enhance the rapid highway network in the Central Plains urban agglomeration, contributing to economic development in the central and western regions of China [4].
新春走基层丨巡检护航 郑洛高速建设加速
He Nan Ri Bao·2026-02-23 23:24