VAALCO Energy, Inc. Announces Encouraging Operational Update

Core Viewpoint - Vaalco Energy, Inc. has announced positive operational updates in Gabon and Cote d'Ivoire, highlighting significant drilling results and a strategic partnership that positions the company for substantial production growth by 2030 [1][4]. Gabon Drilling Highlights - The Etame 15H-ST well has been successfully drilled and completed, achieving a stabilized flow rate of approximately 2,000 barrels of oil per day (BOPD) with a 38% water cut [6]. - The company is actively managing the well to stabilize pressure and reservoir management [6]. - A new exploration well in West Etame has been spudded, with a 57% chance of geological success, expected to reach the target zone by mid-March [6]. Cote d'Ivoire Highlights - Vaalco has been confirmed as the operator with a 60% working interest in the Kossipo field, which has an estimated 293 million barrels of oil equivalent (MMBOE) in place [4][6]. - A field development plan (FDP) is expected to be submitted in the second half of 2026, aimed at enhancing production in Cote d'Ivoire [4]. - The Baobab FPSO is on track to return to the field and commence production in Q2 2026, which, along with the Gabon drilling campaign, is anticipated to drive meaningful growth [4][6].