Core Viewpoint - The temporary closure of the Gucheng Station and Babao Mountain Station on Line 1 is necessary to facilitate the construction of the Line 1 branch and ensure its integration with the existing Line 1 operations [2][4][14]. Group 1: Construction Details - The closure is part of the construction of the Line 1 branch, specifically for the "connection point" modification at the eastern side of the Bajiao Amusement Park Station, which involves complex construction work including the demolition of existing structures and the relocation of numerous pipelines [2][4]. - The construction will result in the temporary closure of Gucheng, Bajiao Amusement Park, and Babao Mountain stations from February 15, 2026, to the end of May 2026, with trains running only to Yuyuan Road Station during this period [2][5]. Group 2: Transportation Alternatives - During the closure, various transportation alternatives will be provided, including bus connections and cycling options, to ensure smooth travel for passengers [2][9][11]. - The local government has implemented comprehensive measures to support transportation, including maintaining order at stations, ensuring bus operations, and managing non-motorized vehicle parking [9][10]. Group 3: Infrastructure Enhancements - Approximately 4,600 new non-motorized vehicle parking spaces have been added around Yuyuan Road and Yangzhuang stations to meet parking demands [10]. - The construction of the Line 1 branch is progressing well, with significant completion of the main structure, and the project aims to enhance the transportation service level in the southwestern area of the city once operational [14].
古城站、八宝山站封站停运,封站期间如何顺畅出行?
Bei Jing Ri Bao Ke Hu Duan·2026-02-25 08:42