Core Viewpoint - West Red Lake Gold Mines Ltd. has reported significant drilling results from its Madsen Mine, indicating potential for high-grade gold mineralization in the 904 Complex, which is expected to enhance the company's mine plan for 2026 and beyond [1][2]. Drilling Results - The underground drilling at the Madsen Mine's 904 Complex has yielded impressive results, including an intersection of 4.75 meters at 219.73 grams per tonne (g/t) gold, with a notable 1 meter at 1,016.57 g/t gold [4][18]. - Additional significant intersections include 3 meters at 148.36 g/t gold and 2.5 meters at 133.13 g/t gold, showcasing the high-grade potential of the area [6][13]. Mining Strategy - The company plans to continue drilling in the 904 Complex throughout 2026 to further define this area for mine design and production, with expectations of starting production in early 2027 [2][3]. - The 904 Complex is viewed similarly to the previously successful 4447 area in South Austin, which contributed significantly to the 2026 mine plan [2][3]. Historical Context - The 904 Complex has seen minimal historical mining, allowing for larger stopes and more efficient extraction from the high-grade zones [2][3]. - Previous drilling results from the South Austin area in 2025 highlighted high-grade lenses of gold mineralization, which have now become a significant part of the company's mine plan [3]. Future Focus - The lower Austin area, particularly the 904 Complex, is anticipated to remain a primary focus for drilling efforts for the remainder of 2026, aiming to uncover additional high-grade gold lenses [3].
West Red Lake Gold Reports 219.73 g/t Au over 4.8m, 148.36 g/t Au over 3m and 133.13 g/t Au over 2.5m in Austin 904 Complex – Madsen Mine
Globenewswire·2026-02-25 10:30