Core Insights - The National Energy Administration has announced the first batch of pilot projects for enhancing the construction capacity of new power systems, including seven energy storage-related projects primarily focused on grid-structured technology applications [1][2]. Group 1: Pilot Projects Overview - Seven energy storage projects have been selected, with six focusing on grid-structured technology applications, located in Inner Mongolia, Zhejiang, Anhui, Yunnan, Shanxi, and Gansu [1][2]. - Key project units involved include China Energy Construction, State Power Investment Corporation, Huaneng, NARI Technology, Southern Power Grid Energy Storage, Wuqing Economic Cooperation Green Energy Technology Co., Ltd., and Juhua New Energy [1][2]. Group 2: Specific Project Details - The Baotou City dual-good grid-structured energy storage project has a planned total capacity that includes both renewable energy and new energy storage, utilizing low-voltage centralized grid technology with a single unit capacity of 30MW and a total scale of 102,000 kW/408,000 kWh [3][14]. - The Zhejiang Longyou shared energy storage project has a total scale of 80MW/160MWh, featuring a dedicated 10MW/20MWh grid-structured unit, providing flexible and stable shared power services to multiple park enterprises, with a 30% increase in equipment utilization and a cost per kilowatt-hour reduced to below 0.2 yuan [3][15]. - The Yunnan Wenshan Qiubei independent energy storage project leads with a scale of 200MW/400MWh, employing cold plate liquid cooling technology and including a 20MW/40MWh sodium-ion battery system, marking it as the first large-scale lithium-sodium hybrid grid-structured energy storage station in the country [3][15]. - The Shaanxi Wuqing Economic Cooperation grid-structured energy storage project is located in the Loess Plateau at an altitude of 1550-1625 meters, covering approximately 90 acres, and includes 75 integrated boost conversion machines and 150 energy storage battery warehouses [3][15]. - The Gansu Juhua New Energy (Yumen) 1GW wind farm project will cover an area of 15.5620 hectares, with a total installed capacity of 1GW and a supporting energy storage system capacity of 150MW/600MWh [3][15].
涉及多个储能项目!国家能源局重磅试点名单