Core Viewpoint - Giant Mining Corp. has engaged Big Sky Exploration for its 2026 Maiden Core diamond drilling program at the Majuba Hill Copper Deposit in Nevada, aiming to advance systematic exploration of the project [1][3]. Company Overview - Giant Mining Corp. focuses on identifying, acquiring, and advancing late-stage copper and copper/silver/gold projects to meet the growing global demand for critical metals driven by initiatives like the Green New Deal [14][15]. - The flagship asset, Majuba Hill, is located 156 miles (251 km) from Reno, Nevada, and benefits from a mining-friendly regulatory environment and strong local infrastructure [15][16]. Drilling Program Details - The 2026 drilling program is planned to include up to 10,000 feet (3,048 meters) of drilling, divided into two phases [3][10]. - Phase 1 consists of up to 5,000 feet (1,524 meters) of core drilling, along with underground mapping and sampling [5][10]. - The program will be guided by over 100 previous drill holes totaling more than 89,000 feet of drilling, which have identified numerous mineralized breccia bodies [6][10]. Geological and Mineralization Insights - Historical drilling results indicate elevated copper and silver values, with intervals of anomalous gold, associated with hydrothermal-magmatic tourmaline matrix breccias [6][13]. - The project shows indications of a potentially large Cu – Ag +/- Au mineralized body, but further drilling is required to determine the extent and grade of mineralization [13][15]. Strategic Alignment - Majuba Hill is aligned with U.S. critical-mineral priorities, supporting domestic supply chain initiatives [7][14]. - The project is positioned to benefit from existing infrastructure, which provides significant cost savings compared to more remote projects [13]. Funding and Execution - The company has secured funding for the next phase of drilling at Majuba Hill, indicating a commitment to advancing the project through systematic drilling and technical evaluation [13][16].
Giant Mining Corp. Engages Big Sky Exploration for Up to 10,000 Feet of Multi-Phase 2026 Drilling at Majuba Hill, Nevada
Thenewswire·2026-02-27 23:55