威海“十四五”能源转型交出亮眼答卷,绿色动能加速崛起
Qi Lu Wan Bao·2026-02-28 04:29

Core Viewpoint - During the "14th Five-Year Plan" period, Weihai City has made significant progress in energy transition, focusing on structural optimization, institutional reform, and industrial integration, establishing a model for high-quality energy development [1] Group 1: Energy Structure Transformation - Weihai is enhancing its energy structure by promoting non-fossil energy sources, aiming for approximately 9.42 million kilowatts of installed non-fossil energy capacity by the end of 2025, which will account for over 77% of the total [2] - The city has successfully launched the world's first fourth-generation nuclear power technology high-temperature gas-cooled reactor and two domestically produced third-generation pressurized water reactors [2] - A significant offshore wind power base is being developed, with over 2 million kilowatts of offshore wind resources reserved, and the first 1.5 million kilowatt project has successfully connected to the grid [2] Group 2: Energy System Innovation - By the third quarter of 2025, non-fossil energy consumption in Weihai is expected to reach 28.4% [3] - The largest pumped storage power station in the province has commenced operations, with a total installed capacity of 2.8 million kilowatts across three sites [3] - The city is advancing the construction of a robust power grid to support high proportions of renewable energy, including a 1,000 kV ultra-high voltage project [3] Group 3: Energy Application Innovation - Weihai is implementing a new energy security strategy focused on "four revolutions and one cooperation," enhancing energy governance through innovation [4] - The city has established the first integrated source-grid-load-storage pilot project in the province, with significant achievements in attracting major energy industry investments [4] - Approximately 31.1% of the heating area in the city is covered by nuclear and clean coal power, with nuclear heating accounting for about 11.1% [4] Group 4: Future Development Focus - Weihai will concentrate on developing nuclear power bases, offshore wind power bases, and new energy industry clusters as key growth engines [5] - The city aims to integrate new energy with industrial development to continuously inject strong momentum into its economic and social development [5]

威海“十四五”能源转型交出亮眼答卷,绿色动能加速崛起 - Reportify