Core Insights - Eco Wave Power Global AB reported significant operational achievements in February 2026, including record wave energy production at its EWP-EDF One pilot project in Jaffa Port, Israel [1][7]. Performance Metrics - The system operated for approximately nine days under moderate wave conditions, generating around 2,000 kWh of clean electricity during this period [2]. - The highest wave conditions recorded at the site reached approximately 3 meters, leading to an average power production of about 20 kWh and a peak production of 56.7 kW, marking the highest levels achieved to date [3][13]. Operational Resilience - Since the beginning of 2025, the EWP-EDF One system has maintained zero downtime, demonstrating stable operation in wave conditions of 1 meter and above [4]. - The performance in February further validates the resilience and scalability of Eco Wave Power's proprietary technology [4]. Future Prospects - Future commercial deployments are expected to utilize larger floaters and a greater number of units, which are anticipated to significantly enhance energy capture and overall capacity factors compared to the current pilot-scale installation [6]. - The pilot project serves as a demonstration array to validate system durability and real-world production performance, providing valuable data for future commercial-scale projects [5]. Global Expansion - Eco Wave Power is expanding its project pipeline globally, with upcoming projects in Portugal, Taiwan, and India, representing a total of 404.7 MW under development [10]. - The company has received international recognition and support from various organizations, including the European Union and the United Nations [10].
Eco Wave Power Reports February 2026 Production Results at Jaffa Port, Achieving Record Output During 3-Meter Wave Conditions