First Mining Intersects 7.18 g/t Au over 8 m at the Miroir Target and Provides Duparquet Project Update
TargetTarget(US:TGT) Prnewswire·2026-03-09 11:00

Core Viewpoint - First Mining Gold Corp. has reported significant drilling results from its Duparquet Gold Project, particularly from the Miroir target, indicating strong potential for resource growth and further exploration in 2026 [1][2][3]. Exploration Results - The 2025 drilling program at the Duparquet Project totaled 16,577 meters, with notable results from the Miroir target, including: - DUP25-090: 4.08 g/t Au over 12.0 m, including 11.20 g/t Au over 1.0 m - DUP25-081: 1.56 g/t Au over 33.15 m, including 3.18 g/t Au over 7.6 m - DUP25-085: 3.74 g/t Au over 15.5 m and 7.18 g/t over 8.0 m, including 30.58 g/t over 1.65 m [1][2][3]. Miroir Target Expansion - The Miroir target has been extended to a vertical depth of 250 m, representing an additional 150 m of down-dip expansion beyond previous drilling, with a current strike length of approximately 150 m [1][2][3]. Environmental Baseline Program - First Mining has initiated a comprehensive environmental baseline data collection program at the Duparquet Project to support regulatory approvals, led by its in-house Sustainability team in collaboration with Stantec [1][2][3]. Future Plans - The company plans to finalize the 2026 exploration program, targeting high-priority areas including Miroir, with drilling expected to commence in Q2 2026 [1][2][3]. Additional Drilling Highlights - Significant results from other targets include: - Valentre target: DUP25-074 returned 1.92 g/t Au over 9.3 m, including 2.80 g/t Au over 4.8 m - Normandie target: DUP25-068 returned 1.39 g/t Au over 4.0 m and 5.22 g/t Au over 1.0 m - Lumière target: DUP25-086 returned 7.74 g/t Au over 1.4 m and 2.23 g/t Au over 1.5 m [1][2][3]. Project Overview - The Duparquet Project is located in the Abitibi region of Quebec, covering approximately 5,800 hectares and hosting an NI 43-101 compliant gold resource of 3.44 million ounces in the Measured & Indicated category, grading 1.55 g/t Au [1][2][3].

First Mining Intersects 7.18 g/t Au over 8 m at the Miroir Target and Provides Duparquet Project Update - Reportify