内蒙古能源集团金山三期机组成功入选内蒙古自治区2025年度能源行业十大科技创新成果
Xin Hua Cai Jing·2026-03-16 01:21

Group 1 - The Inner Mongolia Energy Bureau announced the top ten technological innovations in the energy sector for 2025, with the "1000MW high-efficiency, flexible, ultra-large flow double extraction cogeneration unit" from Inner Mongolia Energy Group's Jinshan Third Thermal Power Company successfully selected [1] - The technology achieves a maximum thermal power ratio of 1.85, with a single unit capable of a maximum heating extraction steam quantity of 1600 tons/hour and industrial extraction steam of 600 tons/hour, while reducing thermal consumption by approximately 1.45% compared to existing advanced units of the same power level [1] - The project has received policy support in terms of annual online electricity indicators, grid operation, scheduling methods, fuel supply, and local taxation [1] Group 2 - The Jinshan Third Thermal Power Company's project integrates green and energy-saving concepts throughout its construction, with two units expected to commence commercial operation in December 2025 and February 2026 [2] - Once operational, the units are projected to generate an annual electricity output of 10 billion kilowatt-hours and provide an additional heating capacity of 5 million square meters, supporting the "West Heat East Delivery" project in Hohhot [2] - The company aims to deepen technological research and innovation, accelerating the construction of an innovative and intelligent power plant to ensure stable energy supply for the high-quality economic and social development of Inner Mongolia [2]

MONGOLIA ENERGY-内蒙古能源集团金山三期机组成功入选内蒙古自治区2025年度能源行业十大科技创新成果 - Reportify