Fury Intercepts 11.74 g/t Gold over 6.63 Metres from Infill Drilling at Eau Claire; Commences Phase 2 Drilling

Core Insights - Fury Gold Mines Limited has announced initial results from its Phase 1 exploration drill program at the Eau Claire Gold project, which is located in Northern Quebec [1][2] Exploration Program - The Phase 1 drilling program focused on expanding resources along high-grade shoots and adding continuity to the existing resource outside of the preliminary economic assessment identified stopes, with a total of 21 holes drilled, amounting to approximately 12,700 meters [2] - Results have been received for 5,550 meters, with complete assay results from 11 holes and partial results from a 12th hole [2] Significant Drill Results - The most notable result was from infill drill hole 26EC-099, which intercepted 11.74 g/t gold over 6.63 meters, located approximately 40 meters down plunge from previous drilling [3] - A second hole, 26EC-101, has been completed and results are pending, which is a further 40 meters step down plunge outside of the existing resource envelope [3] Resource Continuity and Future Potential - Drilling at Eau Claire continues to confirm that mineralization remains well-developed and predictable within the deposit, indicating potential for growth in the Gap Zone between resource blocks in previously untested areas [4] - The company is looking forward to continued drilling to further de-risk and expand the Eau Claire project, aiming to unlock additional value for shareholders [4] Upcoming Drilling Campaign - A Phase 2 drill campaign is now underway, focusing on converting inferred portions of the resource and extensions to the indicated resource category, with an anticipated additional 15,000 to 25,000 meters of drilling expected to continue through spring and summer of 2026 [6]

Fury Gold Mines -Fury Intercepts 11.74 g/t Gold over 6.63 Metres from Infill Drilling at Eau Claire; Commences Phase 2 Drilling - Reportify