Q2 Metals Announces Multiple 200+ Metre Intervals of Continuous Spodumene Pegmatite and Provides an Update on the Inaugural Mineral Resource Estimate at the Cisco Lithium Project, Quebec, Canada
Highlights: Drill hole CS25-071 encountered eight (8) spodumene pegmatite intervals, with the widest continuous interval of 264.6 m, followed by an additional 152.9 m of continuous spodumene pegmatite.Drill hole CS25-074 encountered five (5) spodumene pegmatite intervals, with the widest continuous interval of 202.7 m, followed by an additional 96.8 m interval.Drill hole CS26-077 encountered two (2) spodumene pegmatite intervals, with the widest continuous interval of 107.8 m, followed by an additional 97.3 ...