Investment Rating - The report does not provide a specific investment rating for the industry Core Insights - The guidelines aim to strengthen the technical management of termite prevention in hydraulic engineering, ensuring the safety of such projects through comprehensive measures and continuous monitoring [2][3] - The principles of termite prevention include a focus on prevention, integration of prevention and control, comprehensive management, continuous monitoring, technological empowerment, and green safety [2] - The guidelines apply to various hydraulic projects, including earth-rock dams, earthen embankments, and channels, emphasizing the need for integrated termite prevention measures during the construction phase [2][3] Summary by Sections General Provisions - The guidelines are established to standardize termite prevention work in hydraulic engineering and ensure project safety [2] - Projects in termite hazard areas must incorporate prevention measures into their construction plans [2][3] Terminology - Key terms related to termite activity and prevention are defined, including "mud cover," "ant path," and "bait" [5][6] Termite Inspection and Monitoring - Regular inspections and monitoring of termite activity are mandated for hydraulic projects in affected areas [9][10] - Inspections should include daily checks, periodic surveys, and special investigations based on project needs [11][12] Hazard Level Assessment - The assessment of termite hazard levels should be conducted within three months of the first detection of termite activity [20][21] - Hazard levels are categorized into light, moderate, and severe, with specific criteria for each level [24][25] Prevention Measures - Prevention strategies should be tailored to the specific characteristics of the project and the local environment [29][30] - Construction phase prevention measures include site clearance and treatment of potential termite habitats [31][32] Control Measures - Various methods for termite control are outlined, including baiting, spraying, and excavation [35][36] - Integrated control methods combine multiple strategies to effectively manage termite populations [38][39] Construction and Environmental Protection - Construction of termite prevention projects must adhere to established management and quality control standards [40][41] - Environmental considerations emphasize the reduction of chemical use and the promotion of eco-friendly treatment options [43] Project Acceptance - Upon completion, termite prevention projects must undergo acceptance checks to ensure compliance with design requirements and effectiveness [46][47] Emergency Response - Emergency measures for termite-related incidents must be included in the safety management plans of hydraulic projects [49][50]
水利工程白蚁防治技术指南(试行)
2026-02-25 01:45